A full length video of this entire demolition job is available for viewing! The first path into the house - front to back
Once inside - nibbling away at the roof
Working the roof and interior walls apart - side to side
Coming around the perimeter clockwise
Exterior walls down to the slab - work starts on the slab and stemwalls
Say goodbye to the pool
The driveway leaves at 100 sq. ft per stroke
Oops, missed a piece . . . . .
Deep footings are probed for and pulled out
Making a mole hill out of a mountain
The hoe operator uses a wide flange beam to put a grade on the site
You would never know a house was here 48 hours ago!
Our thanks to the great folks at Terra for a job well done! A full length video of this entire demolition job is available for viewing! |